Specification
The numbers and the drawings.
Every dimension on this page is taken from the plan set. Anything derived is labelled where it appears.
Schedule
Double Wave 12, as drawn.
Every figure below is taken from plan set 01.7, dated 5 August 2026, by Werkstatt Wien.
Where the energy goes
The second wave is the efficiency argument.
Because wave 2 is driven by water that has already been paid for, the marginal cost of the second riding surface is the structure around it — not another pump house, another intake, another electrical supply.
Plan set 01.7 · 2026-08-05
The drawings.
Siteplan, floorplan and sections as issued by Werkstatt Wien — Spiegelfeld ZT GesmbH, Vienna. Select any sheet to enlarge it.
Renderings